Every road, driveway and car park in Australia is built on layers of crushed rock. From the subgrade at the bottom to the sealed surface you drive on, aggregates and road base materials form the structural backbone that carries traffic loads, resists deformation and provides long-term durability.
Understanding how aggregates are used in each layer of road construction helps you specify the right materials, avoid costly mistakes and ensure your project meets engineering requirements. This guide explains the role of aggregates at every stage of road building, from formation to finished surface.
The Layers of Road Construction
A road pavement is not a single slab of material. It is a carefully engineered structure made up of distinct layers, each with a specific function. Working from the bottom up, the typical road construction profile consists of the following layers.
| Layer | Function | Typical Materials | Typical Thickness |
| Surface course | Wearing surface, skid resistance, waterproofing | Asphalt with 7mm, 10mm or 10/7 blend aggregates; spray seal | 25 – 50mm (asphalt) |
| Binder/base asphalt | Structural strength, load distribution beneath surface | Asphalt with 14mm, 20mm or 20/14 blend aggregates | 40 – 100mm |
| Base course | Primary load-bearing layer, resists deformation | DGB20 (20mm dense graded base) or equivalent | 100 – 200mm |
| Subbase | Load distribution, drainage, reduces base course depth | DGS40 (40mm dense graded subbase) or unspec roadbase | 150 – 300mm |
| Select fill / formation | Levels subgrade, provides uniform foundation | 65mm minus general fill, select material | 150 – 300mm (SMZ) |
| Subgrade | Natural ground or imported fill | Existing soil (may require stabilisation) | Varies |
The thickness and material specification for each layer depends on the expected traffic loading, subgrade conditions and the design life of the road. Government and council roads in NSW are typically designed to TfNSW (Transport for NSW) specifications, while private roads may use equivalent or unspecified materials depending on the project requirements.
Subgrade and Formation
The subgrade is the natural ground on which the road is built. Before any aggregate layers are placed, the subgrade must be assessed, shaped and compacted to provide a uniform foundation. Where the natural soil is weak, unstable or inconsistent, it may need to be removed and replaced with imported fill, or stabilised with cement or lime.
A Select Material Zone (SMZ) is commonly placed on top of the subgrade to create a stable working platform for the layers above. This is typically 150 to 300mm of select fill material, such as 65mm minus crushed rock, compacted in lifts to achieve the required density. The SMZ protects the subgrade from construction traffic and provides a consistent foundation for the subbase.
Subbase Layer
The subbase sits above the formation and below the base course. Its primary role is to distribute traffic loads over a wider area, reducing the stress on the subgrade. It also provides drainage and reduces the volume of more expensive base course material required.
In NSW road construction, the most common subbase material is DGS40 – a 40mm dense graded subbase that meets TfNSW specifications. DGS40 provides excellent compaction, load distribution and drainage properties. For projects that do not require formal TfNSW certification, a 40mm unspec roadbase offers a cost-effective alternative with similar performance characteristics.
Subbase layers are typically 150 to 300mm thick, compacted in lifts of no more than 150 to 200mm at a time to achieve the required density. Proper compaction at optimum moisture content is critical for subbase performance.
Base Course
The base course is the primary structural layer of the road. It sits directly beneath the surface and bears the concentrated loads from traffic. This layer must resist deformation under repeated loading while maintaining a smooth, even profile for the wearing surface above.
DGB20 is the standard base course material for road construction in NSW. This 20mm dense graded base meets TfNSW specification 3051 and is required for government road projects, council works and many commercial developments. It compacts to a dense, stable surface with minimal voids, providing the load-bearing capacity needed for sealed road pavements.
For private roads, driveways and lighter-traffic applications, a 20mm unspec roadbase provides an economical alternative. While it does not carry formal TfNSW certification, it offers good compaction and structural properties for general use.
Base course layers are typically 100 to 200mm thick and require compaction to 95 to 98 percent of maximum dry density. The quality of the base course directly determines how well the road surface performs over time.
Asphalt and Surface Course
The surface course is the top layer of the road that vehicles drive on. In most modern road construction, this is an asphalt layer, though spray seals are also common, particularly on lower-traffic rural roads. Aggregates are the primary structural component of asphalt, making up around 90 to 95 percent of the mix by weight.
Wearing Course Aggregates
The wearing course is the top asphalt layer that provides the road surface texture, skid resistance and waterproofing. It uses smaller aggregates – typically 7mm, 10mm or a 10/7 blend – to achieve a smooth, dense surface finish. The fine aggregate size also reduces tyre noise and provides a comfortable driving surface.
Binder and Base Course Asphalt Aggregates
Beneath the wearing course, thicker asphalt layers use larger aggregates for structural strength. The 14mm, 20mm and 20/14 blend aggregates are commonly used in binder course and base course asphalt, where the priority is load-bearing capacity rather than surface finish. These layers are typically 40 to 100mm thick depending on the design traffic loading.
Spray Seal Aggregates
Spray sealing is a cost-effective surfacing method used on lower-traffic roads, particularly in rural areas. The process involves spraying bitumen onto the prepared base, then spreading single-sized aggregate onto the surface. The 7mm and 10mm aggregates are commonly used as seal stone. Aggregate quality is critical for spray seals because the stone must bond firmly with the bitumen to resist stripping under traffic.
Drainage and Erosion Control
Road construction does not stop at the pavement edge. Effective drainage is essential to protect the road structure from water damage, and aggregates play a key role in drainage systems alongside and beneath roads.
Clean, single-sized drainage aggregates – typically 20mm or 40mm with minimal fines – are used in subsurface drainage systems, table drains and culvert surrounds. These products allow water to flow freely through the material while providing structural support.
For erosion control on road embankments, batters and drainage channels, larger rock products such as gabion rock and armour stone provide long-term protection. For details on these products, see our specialty rock range.
Common Road Pavement Designs in NSW
TfNSW recognises several standard pavement design approaches, each using aggregates in different combinations. The choice of design depends on traffic loading, subgrade conditions, design life and budget.
- Full-depth asphalt: An SMZ foundation topped with up to 350mm of asphalt layers. Uses aggregates throughout the asphalt for structural strength and surface performance.
- Sprayed seal over granular base: A granular subbase topped with DGB20 base course and a sprayed seal surface. This is one of the most common designs for council and rural roads, using road base aggregates for the structural layers and fine aggregates for the seal stone.
- Thick asphalt over cement subbase: Combines cement-stabilised subbase with asphalt layers above. Aggregates are used in the asphalt layers and may be blended into the cement-stabilised material.
- Thick asphalt over lean-mix concrete: A lean-mix concrete subbase topped with asphalt. Aggregates are key components in both the concrete and asphalt layers.
For detailed information on road base and subbase products that meet TfNSW specifications, see our full road construction product range.
Choosing the Right Aggregate for Your Road Project
The right aggregate depends on which layer you are building, the specification requirements, and the expected traffic loading. Here is a simplified guide.
| If you need… | Consider… | Learn more |
| Subbase material | DGS40 (specified) or 40mm unspec roadbase | Road construction products |
| Base course | DGB20 (specified) or 20mm unspec roadbase | Road construction products |
| Asphalt aggregate | 7mm, 10mm, 14mm, 20mm or blended products | Aggregate products |
| Seal stone | 7mm or 10mm single-sized aggregate | Aggregate products |
| Road drainage | 20mm or 40mm clean drainage aggregate | Aggregate products |
| General fill / formation | 65mm minus select fill | Road construction products |
| Fine materials (bedding, mortar) | Crusher dust, manufactured sand | Sand and dust products |
Not sure which materials your project requires? Our team can recommend the right products based on your project specifications, traffic loading and budget. We supply road construction materials for everything from residential driveways to major civil infrastructure works across the Hunter Valley.
1300 150 777 or browse our road construction products and aggregate range for full product details.
Frequently Asked Questions
What are the layers of road construction?
A typical road consists of several layers built from the ground up: the subgrade (natural ground), select fill or formation layer, subbase, base course and surface course. Each layer uses different aggregate and road base products selected for their specific function, from load distribution at the bottom to a smooth, durable driving surface at the top.
What aggregate is used for road base?
The standard road base material in NSW is DGB20, a 20mm dense graded base that meets TfNSW specifications. It is the primary load-bearing layer in road construction and is required for government and council road projects. For private roads and driveways where formal specification compliance is not required, a 20mm unspec roadbase provides a cost-effective alternative.
What size aggregate is used in asphalt?
Asphalt aggregate size depends on the layer. Wearing course (the top layer) uses smaller aggregates such as 7mm or 10mm for a smooth surface finish. Binder and base course asphalt use larger aggregates, typically 14mm, 20mm or 20/14 blends, for structural strength. Spray seals use 7mm or 10mm single-sized aggregate as the seal stone.
What is the difference between DGB and DGS road base?
DGB (Dense Graded Base) is a finer, 20mm product used as the base course layer directly beneath the road surface. DGS (Dense Graded Subbase) is a coarser, 40mm product used as the subbase layer beneath the base course. Both meet TfNSW specifications but serve different structural roles. Most road projects require both layers.
Do you supply aggregates and road base for council and government projects?
Yes. Hunter Blue Metal supplies TfNSW-specification road base (DGB20) and subbase (DGS40) materials, along with the full range of single-sized and blended aggregates used in asphalt and road surfacing. We supply council road maintenance programs, government infrastructure projects and commercial developments across the Hunter Valley and Newcastle. Contact our team for availability and documentation.
Can you deliver road construction materials to my site?
Yes. We offer bulk delivery of all road base, subbase and aggregate products throughout the Hunter Valley, Newcastle and surrounding regions. Our fleet delivers direct to site, from single-truck loads for residential driveways to multi-delivery schedules for major road construction projects. With stock ready to go, we can typically offer next-day delivery. Learn more about our delivery service.